Integrated engineering platform:
power center + compute hub + agro cluster

Public landing page for the Yadrin Energy Park project. The project combines power generation, digital infrastructure and agro production within one site, with coordinated nodes, utility inputs and corridor routing.

Information is for reference only and does not constitute a public offer. Parameters and solutions are refined during design and approvals.
Node 295 and project master plan
Anchor node
295
Power center + Compute Hub (Phase 1)
Utility corridor
Plot 298
Transport/utility corridor (reserve)
Gas unit
GRPSH‑1
HP inlet from 297 → MP outlet to 295
Phasing
Phase 1 → 2
Core scope → expansion

Project

Yadrin Energy Park is an integrated site where a power center and digital infrastructure provide the foundation for the agro cluster and resident customers. The public version shows engineering connectivity and phasing without disclosing commercially sensitive metrics.

Overview
Engineering networks
Agro cluster

A3 package (Stage P)

General plan sheets and engineering coordination are available in the Document Center. We do not display full-page scans on the landing page to keep it lightweight.

Open Document Center

Investments / DFA

One of the potential financing instruments is the issuance of digital financial assets (DFA / “ЦФА”).

  • Indicative target return for 2026: 20% p.a.
  • One of the tracks: DFA via the Alfa‑Bank platform (terms to be confirmed).

For information only. Not a public offer and not an investment advice.

Nodes map (292–298)

Click a node to see a short public summary and key utility links.

Nodes map (292–298)

Detailed specs and full design packages are available upon request (NDA).

Resident packages

3–5 standard configurations. Click “Open package” or select a node on the map and press “Pick configuration”.

Aquaculture & fish processing

Optional RAS + water/process utilities + cold/warehouse (per ToR). Nodes: 292, 294, 296, 295.

Open package

Greenhouse + drying/ingredients

Year‑round output + drying/ingredients/warehouse. Nodes: 293, 296, 294, 295.

Open package

Dairy ingredients

Site for energy‑ & water‑intensive processing (milk powder/whey) — resident vector. Nodes: 294, 296, 295.

Open package

Oils / feed / ingredients

Drying/pelletizing/warehouse + utilities: feed & ingredients (resident supply dependent). Nodes: 296, 294, 295, 297.

Open package

Digital traceability / Compute Hub

Compute Hub for resident IT: monitoring, reporting, quality docs. Node: 295.

Open package

Pick a configuration

Fill in the resident profile — we will prepare a preliminary configuration / quote for utilities, nodes and placement options. This is not an offer; parameters are clarified via TOR and (if needed) under NDA.

What you get

  • Suggested node(s) and configuration based on power/utilities.
  • Preliminary link to the utilities corridor and connection points.
  • List of documents/approvals (public / under NDA).
  • Phased launch recommendation (Phase 1/2).
Tip: choose a node on the interactive map — it will be added to the “Nodes” field.
Open email
Request text (copy):

Resident packages comparison

Quick view of engineering resources and infrastructure. Final configuration is defined in the TOR/spec.

Resource / layer Aquaculture / fishGreenhouse + dryingDairy ingredientsOils / feed / ing.Compute / digital
Power (10 kV)
10 kV inlet / ring
Gas (HP→MP)
Node 297 → GRPSH‑1 → collector
Heat / cold
Heat from Energy Center; cold on request
Water / treatment
Node 294: water & processing
Drying / pelletizing / warehouse
Node 296: drying & warehouse (CO₂ optional)
CO₂ loop
Optional (TOR / phasing)
Digital layer / monitoring
Compute Hub (node 295)
Export-ready documentation
Full pack — under NDA
NDANDANDANDANDA
✓ Included◐ OptionalNDA

FAQ

Short answers for residents, investors and partners.

What are nodes 292–298?
Functional zones of the site (energy/greenhouse/water/drying/aquaculture/gate/corridor) mapped to the masterplan and utilities routes.
Can we start small and scale?
Yes. The corridor and node logic supports staged capacity build‑up and additional loops per TOR/spec.
Are there fixed utility prices?
Public materials provide a framework. Commercial terms depend on load profile, consumption schedule and contractual structure.
What is public vs. NDA?
Public: masterplan, utilities schemes, public A3 packages, selected pricing materials and policies. NDA: full specs, full P/ RD, financial model, draft contracts.
How to choose a package?
Open “Packages”, review comparison, then use “Pick configuration” and submit your profile.
Where can I see connection schemes?
See “Map” and “Infrastructure”: gas, heat, water, 10 kV, CO₂ (optional).
Logistics / warehousing?
Node 296 covers drying/pelletizing/warehouse. Cold chain and exact parameters are specified in TOR.
Do you guarantee export to China?
No. The park does not guarantee export or replace resident certification. We provide infrastructure and export‑ready engineering.
Is there a CFA financing option?
One direction is CFA instruments (including Alfa‑Bank) for projects/equipment. Terms depend on deal structure.
How to request the extended pack?
Use the contacts in the footer (email/phone). NDA is required for full access.

Business lines

Public overview of business lines. Commercial parameters and configurations are provided on request (presentation / quote).

Power center (gas engine gensets)

Power center (gas engine gensets)

Electric power/capacity is the project’s foundation. Potential heat recovery for on-site consumers.

Anchor node: 295 • Phase 1
Compute Hub

Compute Hub

Colocation / hosting: engineered site, cooling, 10 kV supply, perimeter security.

Integrated with node 295 • Phase 1
Greenhouse cluster

Greenhouse cluster

Year‑round growing with climate control and heat/water supply via utilities.

Phase 1–2 • Node 293
Water & processing

Water & processing

Water treatment and processing as part of the agro value chain: infrastructure and process lines.

Nodes: 293 / 294 • Phase 1
Drying / granulation / warehouse

Drying / granulation / warehouse

Logistics and processing capacity. A CO₂ module can be considered as an option.

Node: 296 • Phase 1
Aquaculture RAS (option)

Aquaculture RAS (option)

Growth option and product‑line expansion in Phase 2 (food‑tech cluster).

Node: 292 • Phase 2

Infrastructure & connections

Public layer: nodes, corridor routing, utility layers and the connection principle.

Engineering sheets — in the Document Center

To keep the landing page clean, we do not display full-size scanned sheets here. Stage P/RD drawings, schedules and detailed schemes are available via the download buttons above and in the Document Center.

Go to Document Center
Technical conditions, crossings and protection zones are provided via the agreed procedure. The full design pack is available on request.

Implementation phases

Phasing: Phase 1 — core scope, Phase 2 — expansion.

Phase 1
  • Power center + Compute Hub (node 295)
  • Agro scope Phase 1 (nodes 293–296)
  • Access & input nodes (297, power/water inlets)
Phase 2
  • Expansion of the greenhouse cluster
  • Aquaculture RAS (node 292)
  • Utility corridor 298: reserve & scaling

Risk register (public summary)

A short bank‑friendly view (no commercially sensitive figures).

RiskPotential impactMitigationStatus
Permits & technical conditionsSchedule slippage, routing constraintsEarly interface alignment, corridor 298, crossings schedulesIn progress
Gas / power constraintsCapacity limits, operating constraintsModular design, phased reserve, TU confirmationMonitoring
Construction timelineCommissioning delays, cost growthWork packaging, critical path control, alternative contractorsPlanned
CAPEX & inflationBudget increase, business case revisionPhasing, spec alternatives, tenderingPlanned
Tariffs / regulationChange in operating economicsScenario analysis, pricing updates, contractual mechanismsMonitoring
Resident occupancyUnderutilization of infrastructureResident packages, early pipeline, flexible configurationsIn progress
Equipment supply chainDelivery delays, substitutionsApproved alternatives, schedule buffer, localizationMonitoring
ESG / environmentalCompliance costs, requirementsESG passport, HSE policies, monitoringIn progress
IT / cyber risksDowntime, data lossSegmentation, redundancy, access proceduresPlanned
Export logisticsTime/cost risks, documentationPackaging/storage/traceability, partner logisticsOptional

*Public summary. Detailed risk model and mitigants are available upon request.

Media

On-site videos (public version).

Video 1

Video 2

Policies & templates

Public area: approved documents for reference.

Hosting

Public section for potential compute residents.

Formats

  • Equipment / rack placement
  • Engineering services: 10 kV supply, cooling, perimeter
  • Timeline and configuration — on request

How to get a quote

Send your requirements: power, rack type, cooling and timeline.

Request a quote

Document center

Public materials for residents and partners. Extended package is available under NDA.

Financial model & bank metrics

CFADS / DSCR / debt schedule — upon request.

Full PD/RD design package

Drawings, schedules, equipment specs.

Commercial terms for residents

Pricing parameters, SLA, placement models.

Contract pack

Draft agreements and appendices.

Access is provided after NDA execution.

Request NDA access

Power & gas pricing

Public table: parameter framework (without tariffs). Current terms — on request.

Public pricing framework

Contacts

Request the project presentation, a quote or a call. Response within 1 business day.

Request form
Email us
Default is Telegram to the manager. You can switch to Email.
Contact details
WeChat
WeChat QR
Scan QR in WeChat.
EDI (Diadoc): diadoc.kontur.ru · ID: 2BM-1327026016-132701001-201601200543248608729
Company details
Полное наименованиеООО "ТОРГОВАЯ КОМПАНИЯ "ВЕРТИКАЛЬ"
Сокращённое наименованиеООО "ТОРГОВАЯ КОМПАНИЯ "ВЕРТИКАЛЬ"
Юридический адрес430030, Республика Мордовия, г. Саранск, ул. Коммунистическая, д. 123А, помещ. 8
ИНН/КПП1327026016 / 132601001
ОГРН1151327002551 (08.12.2015)
Телефон/факс8 927 841 00 61
Р/с (RUB)40702810208180001620
К/с30101810145250000411
Р/с (CNY)40702156625170000541
БанкФилиал "Центральный" Банка ВТБ (ПАО)
БИК044525411
SWIFTVTBRRUM2MS2
Генеральный директорРозгин Виталий Валерьевич
Location: Russia (location and materials — in Data Room)